  • Boyce Park AMD Treatment System
    No
    Surface
    Passive Treatment System
    Turtle Creek
    Braddock
    Piersons Run

    A passive system was constructed to address mine drainage in Boyce Park

    2008
    $340,027.00
    $0.00
Water Quality Data Summary
Sample PointFlow - Field!!(gal/min)pH - Field!!(S.U.)pH - Lab!!(S.U.)ORP - Field!!(mvolts)DO - Field!!(mg/L)Temp - Field!!(C)Cond - Lab!!(umhos/cm)Alkalinity - Field!!(mg/L)Alkalinity - Lab!!(mg/L)Acidity - Lab!!(mg/L)T. Fe  - Lab!!(mg/L)D. Fe - Lab!!(mg/L)T. Mn  - Lab!!(mg/L)D. Mn  - Lab!!(mg/L)T. Al - Lab!!(mg/L)D. Al - Lab!!(mg/L)SO4 - Lab!!(mg/L)TSS - Lab!!(mg/L)
281-A114.52.933526.51.8212.6138300262.656.59--1.1--35.99--738.42.3
281-A275.35.283044.9812.89612723.6613.960.26--0.33--12.95--515.233.3
281-A38.33.553.41491.58.7615.1158300269.168.04--1.69--53.64--962.210.3
RRO3.58.113.661018.6718.732916461.88-54.930.03--0--0.03--41.15.5
281-F45.27.25.76122.36.416.19896144.26-36.520.2--0.49--0.85--350.410
Treatment Technologies
Treatment Technology Quantity of Elements
Aerobic Wetland 1
Settling Pond 3
Vertical Flow Pond (VFP) 1