Description
AMD; Sampled at the pipe that takes water from the intake to the new pond A & B (Same as B1 and B2 on schematic). The pipe discharges into a channel that feeds both ponds. This channel is a half pipe that needs continual maintenance to remove the AMD sludge buildup and keep the water running to both ponds. AKA ESPYIN and Espy Run TS Influent New Pipe
Type
AMD
Flow Order
2
Location by GPS
No
City
Township of HANOVER
Aliases
Espy Run TS Influent New Pipe
ESPYIN
Latitude
41.205385
Longitude
-75.981233
Inflow
On
Outflow
Off
ID's
111703