Description
Sampled at the effluent spillway of the Forebay; This sample point represents the true influent to the De Sale Phase 3 system as it includes all the water from the collection pond as well as the collection ditch;includes discharges 10A and 10B
Flow Order
1
Location by GPS
No
City
Venango
State / Province
PA
Latitude
41.141489
Longitude
-79.837669
Inflow
On
Outflow
Off