Skip to main content

SP1

Settling Pond 1 (SP1); Receives flow from all 3 AFVFPS as well as rock drains DB, NRD, and SRD:  The sample point is essentially the same location as ORBPOND2 of the original system and could potentially be combined.

Type:
Quad:
Lat:
Long:
Inflow: No
Outflow: No
Flow Order: 6
ID's:
Aliases:

Return to Project Sample Points | Manage Audience | Edit | Delete