Babb Creek Klondike Mine Treatment System

Babb Creek Klondike Mine Treatment System

Project Details
Original Construction Year 1997
Most Recent Rebuild Year
Total Cost 0.00
Total Capital Cost $80,000.00
Latitude / Longitude Method Unknown
Latitude 41.660000
Longitude -77.174167
Elevation 0
Project Babb Creek Klondike Mine Treatment System
Project Type Passive Treatment System
Project Status
AMD Source Underground
Stream
Watershed
River Basin Susquehanna
Quad Cherry Flats
City/Township Bloss
County Tioga
State PA

Description: The original passive system was constructed in 1997 with an $80,000 EPA. PA DEP designed the system and assisted with construction.The system was upgraded in 2005 with the construction of settling pond with a 10,000 PA DEP Growing Greener Grant. In 2007 the compost in the Vertical Flow Pond was replaced.

Water Quality Data Summary

Treatment Technologies
Treatment Technology Quantity Status
Settling Pond 1 N/A
Vertical Flow Pond (VFP) 1 N/A
Location Links
Map
GPS Directions
Project Contacts
Contact Person:
Contact Organization: Babb Creek Watershed Association
Project Designer:
Project Designer Organization: PA DEP
Project Responsible Organization: Babb Creek Watershed Association
Organizations
no data available
External System IDs
Title System
D1-146 Datashed 1.0
PA-91 OSM
Project Performance