Skip to main content

User account menu

Welcome, guest Sign In Create Free Account
Home Datashed

Main navigation

  • Home
  • Projects
  • Watersheds
  • Organizations
  • Map
  • Get Help
› Projects › Audenreid Tunnel
  • Sample Points
    View Sample Points
  • Data
    Upload CSV Data Water Quality Report Full Water Quality Report
  • Gallery
    View Gallery
  • Documents
    View Documents
  • FACTS
  • Map
  • Organizations
    View Organizations
  • Forms
12625
Audenreid Tunnel
project-audenreid-tunnel

Photo Gallery

04 03 1
06 17 06 audenreid site dedication
07 05 06 clearing debris from distribution box after flood damage.
07 05 06 view of collapsed mine opening and damaged intake system after the june 27 29 2006 flooding
07 21 05 view of intake system site preparation from above mine opening
08 10 05 view of intake system showing rock filter and rip rap lined overflow channel
08 10 1
08 10 2 2
10 10 05 intake distri chamber with guillotine values on piping to the three limestone tanks
10 10 05 view of drawn down discharge pipe for the two settling ponds.

Pagination

  • Page 1
  • Next page ››
Copyright 2020 Stream Restoration Incorporated