Sample Points
Sample Point | Aliases | Photo | ID's | Inflow | Outflow | Years Monitored | Description | Audience | Edit | Delete |
---|---|---|---|---|---|---|---|---|---|---|
ER13A | N/A | Yes | No |
AMD; Influent to the ER 13/14 passive system; A limestone channel collects and conveys the discharges to the Forebay (Equilization Basin) of the treatment system. It is uncertain if the influent is at the 36" pipes going into the Forebay or pipes coming out of Forebay. |
Manage Audience | |||||
ER13B | N/A | No | No |
Effluent of Vertical Flow Pond B |
Manage Audience | |||||
ER13C | N/A | No | No |
Effluent of Settling Basin C |
Manage Audience | |||||
ER13D | N/A | No | No |
Effluent of Vertical Flow Pond D |
Manage Audience | |||||
ER13E | N/A | No | Yes |
Effluent of Settling Basin E and Final Effluent of the ER13/14 passive system |
Manage Audience | |||||
ER3 | N/A | No | No |
Emigh Run; Point 3; Sampled above ER13/14 treatment; Alder Run Engineering sample point |
Manage Audience | |||||
ER4 | N/A | No | No |
Emigh Run; Point 4; Sampled Below ER13/14 treatment system; Alder Run Engineering point |
Manage Audience |