Skip to main content

Sample Points

Sample Point Aliases Photo ID's Inflow Outflow Years Monitored Description Audience Edit Delete
ST 63E-1 N/A No No Manage Audience
MR MOUTH N/A No No Manage Audience
68 N/A No No Seaton Creek; Sampled before confluence with main branch of Slippery Rock Creek; Final downstream point of Seaton Creek; Essentially the same as sampling point 68.1 Manage Audience
ST63 N/A No No Manage Audience
ST 63E N/A No No Abandoned mine discharge; Largest of the discharges; flows were measured at 90 degree V-Notch weir at the abandoned railroad grade; Currently collected in anoxic collection system 1 and conveyed into ALD1 Manage Audience
65 N/A No No Seaton Creek; Farthest downstream sampling point before confluence with Slippery Rock Creek; Essentially the same as the sampling point 68 Manage Audience
61-5P N/A No No Piezometer; Installed on 2/11/02 by Mckay and Gould Manage Audience
ST 63E-2 N/A No No Abandoned mine discharge at source; Located ~125 feet east of 63-1 and contributed flow measured at the ST63E weir; Currently collected into ALD1 via Anoxic Collection System 1 Manage Audience
ST 63D N/A No No Abandoned mine discharge; Sampled at breech in old Rail Road Grade located about 225 feet south of gas line crossing Seaton Creek Manage Audience
T2 N/A No No Seaton Creek; Near mouth; Operation Scarlift monitoring point from report SL-110 Manage Audience
61-4P N/A No No Piezometer; installed on 2/11/02 by Mckay and Gould Manage Audience
KY3H N/A No No Manage Audience
ST 63C N/A No No Abandoned mine discharge; emenates from a 12" smooth steel pipe on west side of "T-Bone" Gob pile; currently collected in Anoxic Collection System 2 and conveyed into ALD2 Manage Audience
MW C-8 N/A No No Monitoring well; Approximately 3.6 foot tall casing; Possible Operation Scarlift well; Located near Sportsmens Club Manage Audience
ST 63D-4 N/A No No Abandoned mine discharge; Sampled along eastern toe of "T-Bone" Gob pile Manage Audience
ST 63C N/A No No Manage Audience
OH-3 N/A No No Monitoring well; Approximate 4 foot tall metal casing; Well installed during Operation Scarlift Manage Audience
61-2P N/A No No Piezometer; Installed on 2/11/02 by Mckay and Gould Manage Audience
ST 63D-3 N/A No No Abandoned mine discharge; Sampled at source approximately 45 feet east of southern terminus of "T-Bone" Gob pile Manage Audience
ST 63B N/A No No Abandoned mine discharge; Previously emenated from a 12" smooth steel pipe located about 225 feet upstream of bridge; Currently is collected in anoxic collection system 2 and conveyed into ALD2 Manage Audience
61-1P N/A No No Piezometer; Installed on 2/11/02 by Mckay and Gould Manage Audience
ST 63D-1 N/A No No Abandoned mine discharge; Sampled at source approximately 150 feet east of "T-Bone" Gob pile Manage Audience
48 N/A No No Seaton Creek at McJunkin Road sampled at bridge; ~1/2 mile Downstream of the De Sale Restoration Area; Upstream of the Erico Bridge Restoration Area Manage Audience
18s N/A No No Manage Audience
ST 63F N/A No No Abandoned mine discharge; Located just above old foundations ~120 feet east of Erico Road; Pooled with no measurable flow Manage Audience
MRMOUTH N/A No No Manage Audience
19.1 N/A No No Seaton Creek; Downstream of sampling point 48 and below the Erico Bridge Restoration Area; Sampled at North Erico (T-504) bridge Manage Audience
ST 63G N/A No No Abandoned mine discharge in swale with little flow Manage Audience
Goff Station Road N/A No No Manage Audience
ST 63E-1 N/A No No Abandoned mine discharge ST63E at source; Largest of the discharges; Flows were measured at 90 degree V-Notch weir at the abandoned railroad grade; Currently collected in anoxic collection system 1 and conveyed into ALD1 Manage Audience
86 N/A No No Manage Audience
ST 63A-1 N/A No No Abandoned mine discharge; Previously located on east side of Erico Road approximately 200 feet from Seaton Creek; Currently being collected and treated in ALD3 Manage Audience
ST BELOW MR N/A No No Manage Audience
34 N/A No No Manage Audience
MR MOUTH N/A No No Manage Audience
68.1 N/A No No Manage Audience
MR MOUTH N/A No No Manage Audience
ALD1 N/A Yes No Anoxic Limestone Drain 1; Sampled at effluent pipe; Receives discharge ST 63E from the anoxic collection system 1 Manage Audience
SP1 N/A No No Settling Pond 1; Sampled at spillway; Receives flow from ALD1 and discharges into Settling Pond (SP2) Manage Audience
SP2 N/A No No Settling Pond 2; Sampled at spillway; Receives flow from Settling Pond 1 (SP1) and discharges into Wetland 1 (WL1) Manage Audience
WL1 N/A No No Wetland 1; Sampled at effluent spillway; Receives flow from Settling Pond 2 (SP2) and discharges to Settling Pond 3 (SP3) Manage Audience
SP3 N/A No No Settling Pond 3; Sampled in effluent spillway; Receives flow from Wetland 1 (WL1) and discharges into Wetland 2 (WL2) Manage Audience
ALD2 N/A Yes No Anoxic Limestone Drain 2; Sampled at Effluent pipe; Receives discharges ST63B, ST63C,and a portion of 63C? And discharges into Settling Pond 4 (SP4) Manage Audience
SP4 N/A No No Settling Pond 4; Sampled at effluent spillway; Recieves flow from Anoxic Limestone Drain 2 (ALD2) and discharges into Wetland 2 (WL2) Manage Audience
SEEP N/A No No AMD Seep Area; Enters Wetland 2 (WL2) Manage Audience
WL2@PP2 N/A No No Wetland 2; Sampled at Plunge Pond 2; Receives influent from Settling Pond 3 (SP3),Settling Pond 4 (SP4) and several seeps (SEEP) and discharges to the Horizontal Flow Limestone Bed (HFLB) Manage Audience
HFLB N/A No Yes Horizontal Flow Limestone Bed; Sampled at effluent pipe; Receives flow from Wetland 2 (WL2) via Plunge Pond 2; Discharges into Seaton Creek; One of two final effluent discharge points of the passive treatment complex Manage Audience
ALD3 N/A Yes No Anoxic Limestone Drain 3; Sampled at effluent pipe; Receives discharge ST 63A and discharges to Settling Pond 5 (SP5) Manage Audience
SP5 N/A No Yes Settling Pond 5; Sampled in spillway; Receives from Anoxic Limestone Drain 3 and discharges to Seaton Creek; One of two final effluent points of the passive treatment complex Manage Audience
61-3P N/A No No Piezometer; Installed on 2/11/02 by Mckay and Gould Manage Audience
61-6P N/A No No Piezometer; Installed on 2/11/08 by Mckay and Gould Manage Audience
ST 63 N/A No No Operation Scarlift background monitoring point prior to mine seal installation Manage Audience
ST 63A N/A No No Abandoned Mine Discharge; previously located along Erico Road across from Three Rivers Sportsmens Club; currently being collected and treated in ALD3 Manage Audience