Sample Points
| Sample Point | Aliases | Photo | ID's | Inflow | Outflow | Years Monitored | Type | Description | Audience | Edit | Delete |
|---|---|---|---|---|---|---|---|---|---|---|---|
| GL19 Sysdis R | N/A | No | No | One of two effluent points of Glenn 19 treatment system |
Manage Audience | ||||||
| GL19 Sysdis L | N/A | No | No | One of two effluent points of Glenn 19 treatment system |
Manage Audience | ||||||
| GL19 ULWR | N/A | Yes | No | Effluent of the Glenn 19 Upflow Limestone Well Right; Raw water not sampled |
Manage Audience | ||||||
| GL19 ULWL | N/A | Yes | No | Effluent of the Glenn 19 Upflow Limestone Well Left; Raw water not sampled |
Manage Audience | ||||||
| GL19 SP | N/A | No | No | Effluent of Glenn 19 Settling Pond |
Manage Audience | ||||||
| GL19 MN Bed | N/A | No | Yes | Effluent of the Manganese removal bed and final effluent of the Glenn 19 passive system |
Manage Audience | ||||||
| Above GL19 | N/A | No | No | Stream; Upstream of Glenn 19 passive system |
Manage Audience | ||||||
| Below GL19 | N/A | No | No | Stream; Downstream of Glenn 19 passive treatment system |
Manage Audience | ||||||
| GL19 Raw Bypass | N/A | No | No | 2026 and on | Other | Raw AMD bypass that has been added on as a sampling point as of 2026 sampling. Located adjacent to the limestone boxes and enters the settling pond without going through the first limestone step. |
Manage Audience | ||||
| ALD1 | N/A | No | No | 2012-2015 | Old sample point, not collected anymore, of effluent from ALD1. |
Manage Audience | |||||
| ALD2 | N/A | No | No | 2012-2015 | Old sampling point, not collected anymore, of effluent leaving ALD2 |
Manage Audience |