Sample Points
Sample Point | Aliases | Photo | ID's | Inflow | Outflow | Years Monitored | Description | Audience | Edit | Delete |
---|---|---|---|---|---|---|---|---|---|---|
VFP 1 | N/A | Yes | No | 3 | Manage Audience | |||||
VFP 2 | N/A | Yes | No | 3 | Manage Audience | |||||
VFPs Combined Outflow | N/A | Yes | Yes | 3 | Outflow of VFPs is one pipe, this flows into the settling pond |
Manage Audience | ||||
Final | N/A | No | Yes | 3 | Final outflow, out of settling pond |
Manage Audience | ||||
TWIN OAKS 1 | N/A | No | No | 2023 and on | This is one of two overflow structures for the Oak Twin (or Twin Oaks) collection pipes. The pipes themselves used to enter the system, but now bypass the system. |
Manage Audience | ||||
TWIN OAKS 2 | N/A | No | No | 2023 and on | The other of the Oak Twin (or Twin Oaks) collection pipes. |
Manage Audience | ||||
PR BYPASS | N/A | No | No | 2023 and on | System bypass pipe, only flows during high flow conditions. |
Manage Audience |