JB1 Phase I nodes
Primary tabs
| Title | Content type | Status | Updated Sort ascending | Operations |
|---|---|---|---|---|
| JB1 | Sample Point | Published | ||
| 94-20 | Sample Point | Published | ||
| SL-1 | Sample Point | Published | ||
| Analysis Report, JB1 Phase I | (2023-08-07) | Analysis Report | Published | ||
| Aerobic Wetland | Treatment Technologies | Published | ||
| Analysis Report, JB1 Phase I | (2021-12-03) | Analysis Report | Published | ||
| JB1 Phase I / Analysis Report, Import 171 | Analysis Report | Published | ||
| JB1 PTS Phase 1 Technical Report | Downloads | Published | ||
| Raccoon Creek AMD Survey and Restoration Plan EPA 104(b)(3) | Downloads | Published | ||
| Raccoon Creek TMDL | Downloads | Published | ||
| Raccoon Creek Watershed Restoration Action Strategy | Downloads | Published | ||
| Raccoon Creek O&M Manual | Downloads | Published | ||
| Racoon Creed AMD Survey | Downloads | Published | ||
| JB1 Phase I Schematic | Downloads | Published | ||
| JB1 Phase I O&M Form | Downloads | Published | ||
| Raccoon Creek | Watershed | Published | ||
| Raccoon Creek | Watershed | Published | ||
| Raccoon Creek | Watershed | Published | ||
| Raccoon Creek | Watershed | Published | ||
| Raccoon Creek | Watershed | Published | ||
| Raccoon Creek | Watershed | Published | ||
| Raccoon Creek | Watershed | Published | ||
| JB1B | Sample Point | Published | ||
| JB1A | Sample Point | Published | ||
| D1-63 | System ID | Published | ||
| PA-12 | System ID | Published | ||
| PA DEP Growing Greener | Funding | Published | ||
| OSM Watershed Cooperative Assistance | Funding | Published |