Skip navigation
Inflow Outflow Years Monitored Description
130A Inflow No 1

Mine drainage; stream; Forebay with intake and siphon directs water to an Oxic Limestone Drain; previously the siphon directed the water to a rotating drum system that delivered limestone pebbles

130D No Outflow 1

Outlet of the OLD

Inlet Stream No No 1

Where treated discharge enters Ayelsworth Creek

Lake Inlet No No 1

Inlet to Ayelsworth Creek Lake

Beach East No No 1

East end of the beach on the lake

Beach West No No 1
Dam Outlet No No 1

The outflow from Ayelsworth Creek Lake Dam