Skip navigation
Project Details
  • Bear Run Phase III
    No
    Passive Treatment System
    Susquehanna
    Bear Run

    Bear Run Phase III, completed in 2007, treats the discharge emanating from the Banks Coal #3 Drift Mine using a manual flush oxic limestone drain.

    2007
Water Quality Data Summary
Sample PointFlow - Field!!(gal/min)pH - Field!!(S.U.)pH - Lab!!(S.U.)ORP - Field!!(mvolts)DO - Field!!(mg/L)Temp - Field!!(C)Cond - Lab!!(umhos/cm)Alkalinity - Field!!(mg/L)Alkalinity - Lab!!(mg/L)Acidity - Lab!!(mg/L)T. Fe  - Lab!!(mg/L)D. Fe - Lab!!(mg/L)T. Mn  - Lab!!(mg/L)D. Mn  - Lab!!(mg/L)T. Al - Lab!!(mg/L)D. Al - Lab!!(mg/L)SO4 - Lab!!(mg/L)TSS - Lab!!(mg/L)
3.1383.443.55----10.63710046.671.16--2.4--3.39--132.31
3.254.36.556.6----13.73624038.33-18.330.08--1.12--0.94--1383.5
Treatment Technologies
Treatment Technology Quantity of Elements
Oxic Limestone Drain (OLD) 1