    The Dundee Wetland was built in 1999(?) to treat about 500 gpm out of the Askam Borehole which functioned without a hitch until the borehole collapsed in 12/2008. In 2010, two new boreholes were drilled by US OSM across Dundee Road. The Dundee Wetland was abandoned and a new treatment system consisting of a maelstrom oxidizer and a settling pond was constructed in 6/2013.

    1999
    $300,000.00
    $0.00
Water Quality Data Summary
Sample PointFlow - Field!!(gal/min)pH - Field!!(S.U.)pH - Lab!!(S.U.)ORP - Field!!(mvolts)DO - Field!!(mg/L)Temp - Field!!(C)Cond - Lab!!(umhos/cm)Alkalinity - Field!!(mg/L)Alkalinity - Lab!!(mg/L)Acidity - Lab!!(mg/L)T. Fe  - Lab!!(mg/L)D. Fe - Lab!!(mg/L)T. Mn  - Lab!!(mg/L)D. Mn  - Lab!!(mg/L)T. Al - Lab!!(mg/L)D. Al - Lab!!(mg/L)SO4 - Lab!!(mg/L)TSS - Lab!!(mg/L)
PA244A3849.56.075.05-33.21.5612.6545146.29103.8-63.5824.31--2.54--0.03--38610.5
PA244C2338.76.546.5-41.46.8914.11070125.51100-70.517.41--2.96--0--401.524.5
Treatment Technologies
Treatment Technology Quantity of Elements
Aerobic Wetland 2
Malestrom Oxidizer 1