  • North Fork Montour Run
    No
    Underground
    Passive Treatment System
    Montour Run
    Clinton
    North Fork Montour Run

    A passive system was installed to treat an underground mine discharge which was impacting the North Fork of Montour Run. The project incorporated the use of 3 ponds built by the PA Turnpike Commission during construction of the Findlay Connector

    2008
    $674,314.00
    $0.00
Water Quality Data Summary
Sample PointFlow - Field!!(gal/min)pH - Field!!(S.U.)pH - Lab!!(S.U.)ORP - Field!!(mvolts)DO - Field!!(mg/L)Temp - Field!!(C)Cond - Lab!!(umhos/cm)Alkalinity - Field!!(mg/L)Alkalinity - Lab!!(mg/L)Acidity - Lab!!(mg/L)T. Fe  - Lab!!(mg/L)D. Fe - Lab!!(mg/L)T. Mn  - Lab!!(mg/L)D. Mn  - Lab!!(mg/L)T. Al - Lab!!(mg/L)D. Al - Lab!!(mg/L)SO4 - Lab!!(mg/L)TSS - Lab!!(mg/L)
FCRAW128.15.65.2234.61.3213.61887106.0649.83117.17145.28132.36.816.36.061.29916.240.2
NFWL1296.456.5126.84.7617.41697110.92102.12-71.016.890.835.034.330.80.02666.216.1
Treatment Technologies